Friday 27 August 2010

How much insulation?!

Insulation is laid down on the finished concrete floor in two layers of 150mm and 75mm. This is 25mm more than specified to take into account differences in floor level.
Tongue and grooved chipboard, 18mm, is laid on top of insulation with glued joints. This was then covered with 4mm ply for protection of surface for the duration of the remaining construction phase.
Ground floor to first floor staircase installed with relative ease, incorporating three kite winders at the top of the flight.
Staircase from first floor to second floor pod, issue has arisen in that in the original arrangement of the staircase opening in the pod floor and calculated rise means that there is not enough head clearance available.