Plastering Started

The front windows were installed.
These were sliding sashes in accordance with the design; assuming the property was in the conservation area.
The MVHR ducting was completed with all vents to each room going back to the MVHR unit.
Dot and dab plaster boards were applied to the walls in readiness for skimming.
Rockwool was filled inbetween studs prior to fixing the plaster board.
A reciprocal site visit was arranged at Newcastle and North Shields.
This allowed us to compare technical details and look at alternative solutions that were being carried out on different Retrofit for the Future competition properties.